The Crest Project is the first Completed project of Malpani Group in Pune/ PCMC area Located in one of the fastest developing areas in Pune, The Crest is in one of the most sought after addresses in Pune. Built in serene and pollution free environment yet within easy driving distance from Baner, Bavdhan and Aundh, the residents of Malpani Crest have the opportunity to live in a clean ambiance away from the city yet close to their daily necessities like schools, hospitals, clubs, malls and restaurants.

Club House

  • Club House with Well-Equipped Gym
  • Table tennis table
  • Billiards table
  • Chessboard & Carrom board
  • Multi-purpose hall
  • Wi-Fi System around clubhouse

Outdoor Amenities

  • Swimming Pool
  • Basketball Post
  • Impressive Entrance Gate with Security Cabin
  • Decorative Entrance Lobby in Parking of Each Building
  • Beautifully Landscaped Garden
  • Children’s Play Area
  • Decorative Compound Wall
  • Ample parking For Visitors around the Buildings
  • Interlocking Paving Blocks / Concrete Road
  • Well Developed Greenery around The Building
  • Convenient shopping for daily shopping need outside the building compound
  • Servant/Driver toilets
  • Senior Citizen Plaza

Club House

  • Club House with Well-Equipped Gym
  • Table tennis table
  • Billiards table
  • Chessboard & Carrom board
  • Multi-purpose hall
  • Wi-Fi System around clubhouse

Outdoor Amenities

  • Swimming Pool
  • Basketball Post
  • Impressive Entrance Gate with Security Cabin
  • Decorative Entrance Lobby in Parking of Each Building
  • Beautifully Landscaped Garden
  • Children’s Play Area
  • Decorative Compound Wall
  • Ample parking For Visitors around the Buildings
  • Interlocking Paving Blocks / Concrete Road
  • Well Developed Greenery around The Building
  • Convenient shopping for daily shopping need outside the building compound
  • Servant/Driver toilets
  • Senior Citizen Plaza

Structure

  • RCC

Earthquake resistant structure confirming to IS: 456-2000

  • BRICKWORK

Internal 6” thick high quality clay brickwork

External 6” thick high quality clay brickwork

Plastering

  • Internal: Neeru/Sanla finish to walls for B-1 B-2Building & POP finish to ceiling
  • Internal: Gypsum finish for B-3 B-4 Buildings to Walls & POP finish to ceiling
  • External: sand faced finish.
  • Ceiling cornices in living room

Painting/Polishing

  • Interior- Oil Bound Distemper (O. B. D.)
  • Exterior- Snowcem Paint / Sandtex (Apex)
  • Veneer with melamine polish (For Main Door shutter-Front Side & Frames)

Flooring

  • 2’*2′ Vitrified (Johnson/ Nitco/Equivalent) For B-1 B-2 Building
  • 26” x 26” Vitrified Tiles (City Tiles/ Equivalent) For B-3 B-4 Building
  • Superior quality designer ceramic tiles for terrace and dry balcony (Antiskid / Rustic) (Johnson/ Nitco/Equivalent)
  • Designer ceramic tiles for all toilets

Kitchen

  • Provision of plumbing points for sink and electrical points to accommodate modular kitchen
  • Kitchen Otta- L shaped 14’Length With Black granite Top With Nirali S. S. Sink
  • With drain board
  • Cladding with glazed tiles above the kitchen platform- Height 4′ Above Kitchen Otta (Kajaria\ Equivalent)
  • Reticulated Gas Pipeline System
  • Provision for –
    Aqua guard Point
    Washing machine point in utility area
    Exhaust FanToilets
  • Ceramic glazed tiles dado- Full Height (Up to ceiling) (Kajaria/Graffiti/Equivalent)
  • Hot and cold water mixer unit for shower in all toilets. (Jaquar Vignette /Equivalent)
  • Hot and Cold water mixer unit for Wash Basin in one Master Bedroom ( Jaquar Vignette/Equivalent)
  • Wash Hand Basin with Granite counter top in all toilets (Kohler / Parry ware/Equivalent)
  • EWC (wall hung type) in all Toilets (Kohler / Parry ware/Equivalent)
  • Health faucet in all toilets ( Jaquar Vignette /Equivalent)
  • Provision for geyser and exhaust Fan For Toilet
  • Main Door
  • Main Door-
  • Frame- Veneer with melamine polish
    Shutter-Front side veneer back side laminated
    SS hardware with night latchOther Doors
  • Internal Doors-
  • Frame & Shutter-Laminated
    SS hardware with locking arrangement
    Black Granite doorframe for all toilets
    Aluminium powder coated sliding doors with Automatic Locking clear glass for living/dining room terrace with one panel for mosquito mesh

Windows

  • Powder coated Aluminium 3-Track Sliding Automatic Locking Windows With Mosquito- Net –Jindal Section in all bedroom & terrace
  • Powder coated Aluminium louvered window with provision for exhaust fan in toilets
  • Black Granite window frame for Kitchen window & in all toilets

Electrical

  • One TV point in the living room and master bedroom
  • Fire resistance electrical wire of Finolex Make / Equivalent
  • Electrical Switches- Woods/Schneider / Equivalent
  • One Miniature Circuit Breaker (MCB) for each flat
  • Provision For Split A/C In Master Bedroom
  • Telephone points in living and master bedroom
  • Provision of Inverter point for each flat
  • Earthing for each building
  • Lightning arrester for the building

Plumbing

  • Concealed Plumbing With PPR/ G. I. (‘C’ Class) Pipes
  • Down take Lines In CPVC Pipes
  • PVC pipes for toilets down take and rain water pipes
  • All plumbing points will be pressure tested
  • Effective storm water system

Lifts

  • Two lifts for each building of OTIS / Equivalent Make

1-Passanger- automatic

1-Service-manual

  • Elegant lift lobbies
  • Marble cladding at ground floor level on the lift-side wall

Security Systems

  • Round-the-clock security for the project with professional security agencies
  • Intercom System will be install at security room to send visitors in side only after confirming with the resident
  • Panic button in each kitchen connected to security in G.F.

Fire Safety

  • Fire Fighting systems as per the statutory requirements in each lobby

Telephone With Intercom Facility

  • Intercom facility from each apartment to security room
  • Broadband Connectivity

Back-up Generator (acoustically insulated)

  • Standby generator for lights in common Areas, One Lift & Electric Pumps

Rain water Harvesting

  • Rainwater harvesting scheme would be provided for recharging the ground water level

Construction Status (Complete & Sold Out)